Novosibirsk Electrode Plant
right_text_abou_buttn

Novosibirsk Electrode Plant

From October 3 till October 15, 2010 at the Baking-Room of Electrode Production was performed lining of 2 shroud roofs of chambers Nos. 5 and 6 of the newly built baking oven No. 5. Hot face of the chamber shroud roofs was lined with PrismoBlock ZA 160 kg/m3 (300*300*610). The total lining area of 2 chamber shroud roofs is 100 m2. On 22 roofs were installed 110 burner blocks BIK. Currently the roofs and burner blocks are in operation.
  • Уралсталь
  • Уфаоргсинтезгаз
  • Славнефтеоргсинтез
  • Северский трубный завод
  • ОГК-6
  • ОГК-2
  • ОГК-1
  • Оскольский электрометаллургический комбинат
  • Новолипецкий металлургический комбинат
  • Новокузнецкий Металлургический Комбинат,
  • Нижнекамскнефтехим
  • Магнитогорский металлургический комбинат
  • m2
  • m
  • Казцинк
  • ig
  • НижнеТагильский металлургический комбинат
  • em alliance
  • Enel
  • enrc
  • Фортум
  • Нижнесергинский метизно-металлургический завод