Taganrog Boiler-Making Works «Krasny Kotelshchik»
right_text_abou_buttn

Taganrog Boiler-Making Works «Krasny Kotelshchik»

From 04.01 to 21.01 2011 at Boiler Workshop No. 1 was completed modernization of Gas Oven No. 1 with pulse gas combustion. Old conventional lining made of boards ShVP was replaced with advanced high temperature ceramic fiber materials. The hot face surface was lined with Prismo-Block S 160 kg/m3 (340*300*610) complete with side anchoring SК-1, SК-2 and Fiberblanket S 128 kg/m3 (25*610*7320). The total lining area of two furnaces was 304 m2. The installation was completed for 12 days. Now the furnace is under operation.
  • Уралсталь
  • Уфаоргсинтезгаз
  • Славнефтеоргсинтез
  • Северский трубный завод
  • ОГК-6
  • ОГК-2
  • ОГК-1
  • Оскольский электрометаллургический комбинат
  • Новолипецкий металлургический комбинат
  • Новокузнецкий Металлургический Комбинат,
  • Нижнекамскнефтехим
  • Магнитогорский металлургический комбинат
  • m2
  • m
  • Казцинк
  • ig
  • НижнеТагильский металлургический комбинат
  • em alliance
  • Enel
  • enrc
  • Фортум
  • Нижнесергинский метизно-металлургический завод